home  >  departments & services  >   public works  
» County Organizational Chart
» County Buildings: Conway | Hwy 701
[adobe pdf format]
» back
 Public Works
Contact Person:
David Gilreath, Director of Public Works

Mailing address:
Horry County Public Works
4401 Privetts Road
Conway, SC 29526

Physical location:
Approximately 10 miles North of Conway on Privetts Road
4401 Privetts Road
Conway, SC 29526

Office: (843) 915-5410

Fax: (843) 365-0671
Office Hours
8:00 am - 5:00 pm
Monday through Friday

» RIDE II Committee

Functions

The Department of Public Works maintains all roadway networks and bridges owned by the county, as well as constructing an average of 8 miles of paved road each year. Currently, this includes 1412 miles of roadways and 72 bridges. There are 633 miles of paved roads ranging from arterial roads such as Carolina Forest Boulevard which carries over 24,000 trips per day to local access roads in neighborhoods and rural areas. There are also 779 of miles of unpaved roads which include roads improved with marine limestone surfaces and also natural earth surfaces.

From 1999 to 2009 Horry County has accepted ownership and maintenance, typically through land development, of approximately 20 miles (average) of new roads each year. Also, unpaved roads are being improved and paved through the local road plan and the local option sales tax road plan known as Riding on a Penny. These two plans will combine to pave between 150 and 200 miles of existing unpaved roads between 2007 and 2014.


Frequently Asked Questions

  • How do I get driveway tile? The Horry County Engineering Department reviews such requests individually and, upon approval, issues an encroachment permit for the placement of items within the County's right-of-way. Encroachment permits are issued at no charge by the Engineering Department. If you have trouble displaying the form online, they will be happy to mail a copy or you can stop by the Engineering Department to pick one up.
  • Where do I pay my water bill? Public Works maintains County roads. We are not responsible for water, sewer, or trash removal in the County.
  • When will my road be worked? All County roads are maintained on a regular schedule, approximately every two (2) weeks or as needed to minimize dust.

Common Terms

  • Plowing/scraping: Terms used to describe work performed by motorgraders on unpaved roads.

  • Coquina: Limestone used as a base to stabilize roads.

  • Slag: Crushed remnants of steel production.

  • Outfall ditch: Ditch that allows water to drain away from roads.

  • Right of Way/Easement: Legal document granting County access for road maintenance purposes.

  • Watershed: Major storm water drainage for Horry County.

Major Projects

  • Heavy Construction Crews: Recently completed paving, Duberry Farm Savannah Lane, Applegate Road, Bunk Lane, Ten Crossing.

  • Currently paving the following roads: Frank Gore Road, NNO Frank Gore, and Sunshine Road.

  • Upcoming Road Projects: Stalvey Road, Ward Road, Smith Blvd. Ashley Circle, Little Mill Road, Tannie Drive, Dogwood Drive and Zaccheus Lane.

Interesting Facts

  • Presently have staff of 79 employees.

  • Maintain over 779 miles of unpaved roads and over 633 miles of paved roads.

  • Average paving - 8 miles of roads per year.

  • Improve approximately 25 miles of roads with slag and coquina per year.

  • Accepted dedication of 13 miles of new roads in fiscal year 2009.

 
home | calendar | council | departments | employment | history | links | news | ordinances | photos
E-Mail your comments on information contained in this site to The Public Information Office.
Questions or problems regarding this site should be directed to Website Technical  Support.
This is the official web site for Horry County Government.
Copyright © Horry County, South Carolina. All rights reserved.